RAILWAY ENERGY

We are contractors for the construction, maintenance and overhaul of all types of rail energy supply systems:
  • Traction systems of 750 V DC, 1,500 V DC, 3,000 V DC and 25 kV AC.
  • Power supply for railway communication and signaling systems.
As contractors, our capabilities include comprehensive project management:
  • Design and construction project.
  • High voltage lines.
  • Building.
  • Outdoor equipment.
  • Indoor equipment.
  • Control system.
  • Testing and commissioning.
 

Rail Energy Solutions

Our PLO (overhead line local operations post) enables the performance of maneuvers, control and supervision (SCADA) of the overhead line circuit breakers adapted to the needs of each installation: devices for trains, metros and trams, and both conventional and high-speed rail.

    

Scada of Remote Control of Disconnectors
With tElphe® systems, we aim to prevent issues caused by ice and snow that block junctions during the winter months and cause serious circulation issues for trains.

The system includes all components needed for the electrical heating of rail junctions, instrumentation and control and monitoring equipment for variables involved in the application.

          

ELECTRICAL INSTALLATIONS

We have extensive experience in delivering all kinds of electrical and communications installations in the field of transport, energy, industry and in the residential sector or urban facilities.
  • Industrial automation.
  • Transformation centers.
  • Low voltage networks.
  • Lighting.
  • High voltage lines.
  • Renewable energy.

Related Projects

PROJECT REVIFE 2 – Design and Development of a Dynamic Wagon Weighing Autofeeded System

TYPE OF WORK I+D+i - GENERACIÓN DE ENERGÍA - EFICIENCIA ENERGÉTICA
CUSTOMER Ministerio de Energía Turismo y Agenda Digital - Fondos FEDER
DATE EN PROGRESO: Inicio: 2016 / Final: 2017

PROJECT CORMORAN: Conversion of energy and monitoring of the power grid of the railway system

TYPE OF WORK I+D+i - EFICIENCIA ENERGÉTICA - MONITORIZACIÓN Y SEGURIDAD
CUSTOMER Ministerio de Energía Turismo y Agenda Digital - Fondos FEDER
DATE 2016

PROJECT ICEBURNER – Switch Point RailWay Heater System whith High Efficiency, Availability and Versatility Performance

TYPE OF WORK I+D - EFICIENCIA ENERGÉTICA - SEGURIDAD FERROVIARIA
CUSTOMER Programa Estatal de Investigación, Desarrollo e Innovación
DATE EN PROGRESO: Inicio: 2016 / Final: 2018

1 2 3 7

España

LEÓN
Pol.Ind. Onzonilla | 2ª fase
24391 Ribaseca. León.
Tel. +34 987 221 004
Fax. +34 987 264 407

MADRID
C/Anabel Segura 11, Edificio A - Planta 3 B-1
28108 Alcobendas. Madrid.
Tel. +34 910 841 707

EEUU

SAN FRANCISCO, CAL.
1001 Bayhill Drive, Suite 234
San Bruno, CA 94066
Tel. +1 (925) 528-8477